Well Construction  

Notice of Intent Forms

Wells Without Fees    Wells With Fees
     
1. Fill out the form using the appropriate link below.
2. Provide a valid e-mail address for us to send your validation.
3. As soon as Ecology receives your form, we will send your validation to the email address you provided.
4. Environmental Investigation wells and Geotechnical Soil Borings are decommissioned immediately after construction; we recently changed the way our forms page works to take this into account. You will now get two PDFs when you complete your Notice of Intent - one for the construction and one for the decommissioning. You no longer need to fill out two forms with the same information, just fill out your Notice of Intent to construct and we'll take care of the rest.
  
Pay by Mail
1.Fill out the form using the appropriate link below.
2.Provide a valid e-mail address for us to send your validation.
3.Print and mail the form along with the appropriate fee.
4.As soon as Ecology receives your form and processes your payment, we will send your validation to the email address you provided.

That's it! No need to mail anything and you won't have to wait for us to mail back your validation. Remember this is ONLY for wells that do NOT require a FEE. Using electronic forms for wells without a fee will save at least 7 to 10 days of process and mail time.

Environmental Investigation - Soil Sampling Well
(form ECY 040-55)


Environmental Investigation - Vapor Sampling Well
(form ECY 040-55)


Geotechnical Soil Boring Well
(form ECY 040-55)





Wells Being Decommissioned

Now all decommissioning forms are on one single page. Whether you have the original Notice of Intent number or not, use this one online form to tell us about the well you are decommissioning.

Decommission a Well
(forms ECY 040-24)
  
You won't have to wait for the validation to come in the mail! Using electronic forms for wells with a fee will save at least 3 to 4 days of process and mail time.

Water Well
(form ECY 040-21)

includes:
  • Injection Well
Environmental Investigation Well - Water Sampling or Measuring
(form ECY 040-52)


Resource Protection Well
(form ECY 040-22)

includes:
  • Instrumentation Wells
  • Monitoring Wells
  • Observation Wells
  • Piezometers
  • Vibrating Wire Piezometers
  • Spill Response Wells
  • Remediation Wells
    *may require a Underground Injection Control permit from Ecology
  • Injection Points
    *injecting compounds for remediation
    requires a Underground Injection Control permit from Ecology
  • Vapor Extraction Wells
Ground Source Heat Pump Boring and Grounding Wells
(form ECY 040-25)

includes:
  • Cathodic Protection Wells
  • Anode Wells
Dewatering Well
(form ECY 040-23)