Publications Home


Publication Summary

Title

Water Quality Study Design (Quality Assurance Project Plan): Deschutes River Multi-parameter Total Maximum Daily Load Effectiveness Monitoring Pilot Project.

 
Publication number Date Published
09-03-133December 2009
VIEW NOW: Acrobat PDF format (Number of pages: 49) (Publication Size: 782KB)




Trouble viewing?
Author(s) Collyard, S., and M. Von Prause
Description This is the study plan for the Deschutes River multi-parameter total maximum daily load effectiveness monitoring pilot project.
REQUEST A COPY The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

Accessibility Options
Persons with hearing loss can call 711 for Washington Relay Service
Persons with a speech disability can call 877-833-6341
Contact Joan LeTourneau at 360-407-6764 or jlet461@ecy.wa.gov
Keywords Deschutes, internet, goals, 303(d), section 303, river, water, quality assurance, quality assurance project plan, water quality, Ecology, monitoring, quality, Total Maximum Daily Load, section 303(d), clean water act,
WATERSHED Water Resource Inventory Area 13 Deschutes
DATA Environmental Information Management (EIM) #SCOL0003

RELATED PUBLICATIONS Title:

POSTER: Using biological and habitat metrics to determine the effectiveness of TMDLs: A Case Study