Publications Home


Error processing SSI file

Publication Summary

Title

Quality Assurance Project Plan: Palouse River Bacteria Total Maximum Daily Load Water Quality Study Design

 
Publication number Date Published
07-03-108July 2007
VIEW NOW: Acrobat PDF format (Number of pages: 45) (Publication Size: 1MB)




Trouble viewing?
Author(s) Mathieu, N., J. Carroll, and B. Nipp
Description This is the study design for the Palouse River Bacteria Total Maximum Daily Load Water Quality Study.
REQUEST A COPY The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

Accessibility Options
Persons with hearing loss can call 711 for Washington Relay Service
Persons with a speech disability can call 877-833-6341
Contact Joan LeTourneau at 360-407-6764 or jlet461@ecy.wa.gov
Keywords assessment, bacteria, conservation, county, creek, environmental, Environmental Protection Agency, quality, quality assurance, river, Total Maximum Daily Load, water, water quality, 303(d), section 303
WATERSHED Water Resource Inventory Area 34 Palouse
DATA Environmental Information Management (EIM) #JICA0001

RELATED PUBLICATIONS Title:

Streamflow Summary for the Palouse and South Fork Palouse Rivers and Selected Tributaries, 2006-08