Publication Home



Polychlorinated Biphenyls (PCBs) (68 publications 2000-2020)


Title (link to summary)NumberDate (released or updated)
Priority Consumer Products Report to the Legislature: Safer Products for Washington Implementation Phase 2 20-04-019July 2020
Quality Assurance Project Plan: Freshwater Fish Contaminant Monitoring 20-03-106April 2020
Western Port Angeles Harbor Public Comment on RI/FS Fact Sheet 20-09-090January 2020
Focus on: Safer Products for Washington 20-04-007January 2020
Priority Consumer Products Draft Report to the Legislature: Safer Products for Washington Implementation Phase 2 20-04-004January 2020
Bay Wood Products 19-09-068December 2019
Snopac Property Cleanup Site 19-09-190June 2019
Snopac Property Cleanup Site Public Participation Plan 19-09-140June 2019
Quality Assurance Project Plan: Measuring PCBs in Biofilm, Sediment, and Invertebrates in the Spokane River: Screening Study 19-03-103March 2019
Atmospheric Deposition of PCBs in the Spokane River Watershed 19-03-003March 2019
PBT Trends in Lake Sediment Cores: 2016 Results 18-03-029September 2018
Wenatchee River PCB Source Assessment, 2016 and 2017 18-03-010March 2018
Addendum 1 to Quality Assurance Project Plan: Product Testing Version 1.0 — PCBs in State Purchased Products 2017 17-04-045December 2017
Spokane River PCBs and Other Toxics at the Spokane Tribal Boundary: Recommendations for Developing a Long-Term Monitoring Plan 17-03-019December 2017
Albion Wastewater Treatment Plant Study of PCBs and Dieldrin in Discharge to the South Fork Palouse River 17-03-007May 2017
Addendum to Quality Assurance Project Plan: Product Testing Program, Version 1.0 — PCBs in State Purchased Products 2017 17-04-004January 2017
Addendum 2 to Quality Assurance Project Plan: Wenatchee River PCB and DDT Source Assessment 16-03-116August 2016
Wenatchee River PCB and DDT Source Assessment 16-03-029July 2016
Quality Assurance Project Plan: Spokane River Atmospheric Deposition Study for PCBs 16-03-112June 2016
Little Spokane River PCBs: Screening Survey of Water, Sediment, and Fish Tissue 16-03-001March 2016
Puget Sound Regional Toxics Model: Evaluation of PCBs, PBDEs, PAHs, Copper, Lead, and Zinc 15-03-025August 2015
Lake Spokane: PCBs in Carp 15-03-022July 2015
Burnt Bridge Creek PCB and Dieldrin Screening Study 15-03-013June 2015
Quality Assurance Project Plan: Spokane River PCBs and other Toxics Long Term Monitoring at the Spokane Tribal Boundary 15-03-111May 2015
Addendum to Quality Assurance Project Plan: Wenatchee River PCB and DDT Source Assessment 15-03-107April 2015
PCB Chemical Action Plan Overview 15-07-010February 2015
PCB Chemical Action Plan 15-07-002February 2015
Draft PCB Chemical Action Plan 14-07-024July 2014
PCB Method Comparison of High and Low Resolution Sediment Analysis 14-03-009March 2014
PCB, Dioxin, and Chlorinated Pesticide Sources to Vancouver Lake 11-03-063December 2011
Washington State Toxics Monitoring Program: Trend Monitoring for Chlorinated Pesticides, PCBs, PAHs, and PBDEs in Washington Rivers and Lakes, 2008 10-03-027April 2010
Contaminant Loading to the Lower Duwamish Waterway from Suspended Sediment in the Green River 09-03-028November 2009
Quality Assurance Project Plan: Dieldrin and PCB Monitoring of Wastewater Treatment Plants in the Palouse River Watershed 07-03-111August 2007
Quality Assurance Project Plan: Yakima River Chlorinated Pesticides, PCBs, Suspended Sediment, and Turbidity Total Maximum Daily Load Study. 07-03-107July 2007
Multiyear PBT Chemical Action Plan Schedule - Final 07-07-016March 2007
Responsiveness Summary for the Draft Multiyear PBT Chemical Action Plan Schedule 07-07-015March 2007
Quality Assurance Project Plan: PCB Monitoring at Walla Walla Wastewater Treatment Plants 06-03-114October 2006
Pullman Stormwater Pilot Study for Pesticides, PCBs, and Fecal Coliform Bacteria, 2005-2006 06-03-034October 2006
Quality Assurance Project Plan: Chlorinated Pesticides, PCBs, and Dioxins in Yakima River Fish - 2006: Assessing Progress Toward TMDL Targets and Updating the Fish Consumption Advisory 06-03-111September 2006
PCBs, PBDEs, and Selected Metals in Spokane River Fish, 2005 06-03-025August 2006
Focus on the PBT Rule 06-07-011February 2006
Quality Assurance Project Plan: Vancouver Lake PCBs, Chlorinated Pesticides, and Dioxins Fish Tissue Investigation 06-03-101February 2006
Quality Assurance Project Plan: PCBs and Other Contaminants in Spokane River Fish, 2005 05-03-120December 2005
Quality Assurance Project Plan: South Fork Palouse River Pesticide, PCB, and Fecal Coliform Stormwater Pilot Study 05-03-115November 2005
Lake Chelan DDT and PCBs in Fish Total Maximum Daily Load Study 05-03-014June 2005
Quality Assurance Project Plan: Assessing Current Levels of 303(d) Listed Pesticides and PCBs in Palouse River Fish 05-03-106May 2005
Concentrations of 303(d) Listed Pesticides, PCBs, and PAHs Measured with Passive Samplers Deployed in the Lower Columbia River 05-03-006March 2005
A Total Maximum Daily Load Evaluation for Chlorinated Pesticides and PCBs in the Walla Walla River 04-03-032October 2004
Quality Assurance Project Plan: Monitoring 303(d) Listed Pesticides, PCBs, and PAHs in the Lower Columbia River Drainage Using a Semipermeable Membrane Device 03-03-108October 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for PCBs in the Spokane River 03-03-107October 2003
Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT and PCBs in Lake Chelan 03-03-105July 2003
TMDL Technical Assessment of DDT and PCBs in the Lower Okanogan River Basin 03-03-013July 2003
Verification of 1998 303(d) PCB Listing, Inner Budd Inlet 03-03-016April 2003
Analysis of Fish Tissue from Long Lake (Spokane River) for PCBs and Selected Metals 02-03-049November 2002
Quality Assurance Project Plan: Verification of 1998 303(d) Listing for PCBs in Budd Inlet (Inner) 02-03-085October 2002
Quality Assurance Project Plan: TMDL Technical Assessment of DDT and PCBs in the Okanogan River 02-03-070August 2002
Quality Assurance Project Plan: TMDL Technical Study: Chlorinated Pesticides and PCBs in the Walla Walla Riverp 02-03-068July 2002
1998 303(d) PCB Listing for Chambers Creek Mussels: New Data 02-03-013April 2002
Quality Assurance Project Plan: Analysis of Fish from Long Lake, Washington, for PCBs and Selected Metals 02-03-088February 2002
PCBs in Sediments at Selected Sites in Puget Sound 02-03-003February 2002
Quality Assurance Project Plan: PCBs in Sediments from Selected Sites in Puget Sound 01-03-072May 2001
Spokane River PCB and Source Survey, August 2000 01-03-016April 2001
An Ecological Hazard Assessment for PCBs in the Spokane River 01-03-015April 2001
Quality Assurance Project Plan: Spokane River PCB Source Survey 00-03-089December 2000
Results from Analyzing PCBs in 1999 Spokane River Fish and Crayfish Samples 00-03-040September 2000
Data Appendix: Reconnaissance Survey on Metals, Semivolatiles, and PCBs in Sediment Deposits Behind Upriver Dam, Spokane River 00-03-026June 2000
Reconnaissance Survey on Metals, Semivolatiles, and PCBs in Sediment Deposits Behind Upriver Dam, Spokane River 00-03-021June 2000
PCB Levels in Bottom Sediments from Lower Sinclair Inlet 00-03-019June 2000