Publications Home


Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Ione Airport Kwik Stop Groundwater Monitoring: September 2013 – August 2016 Results

 
Publication number Date Published
17-03-005March 2017
VIEW NOW: Ione Airport Kwik Stop Groundwater Monitoring: September 2013 – August 2016 Results (Number of pages: 73) (Publication Size: 3898KB)




Trouble viewing? Try these free options.
Author(s) Gallagher, B.
Description In 2013-2016, the Department of Ecology conducted quarterly groundwater sampling of 33 wells at the Ione Airport Kwik Stop cleanup site. During August 2016, 12 wells (43%) had GRPH (gasoline) concentrations that exceeded the MTCA Method A cleanup level of 800 ug/L. BTEX (benzene, ethylbenzene, toluene, xylene) compounds were detected at concentrations higher than the applicable MTCA Method A cleanup levels in three of the sampled wells (11%), which are located between the Kwik Stop and the Cabin Grill, a former restaurant located downgradient to the SE of the Kwik Stop. The most significant groundwater contamination exists near the Kwik Stop and the Cabin Grill. Active remediation is ongoing at these locations.
REQUEST A COPY The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

Accessibility Options
Persons with hearing loss can call 711 for Washington Relay Service
Persons with a speech disability can call 877-833-6341
Contact Brian Gallagher at 509-329-3437 or bgal461@ecy.wa.gov
Keywords BTEX, GRPH, Model Toxics Control Act (MTCA), petroleum hydrocarbons, toxics cleanup, remediation, remedial action, toxics, toxics monitoring, toxic, toxic cleanup site, petroleum contaminated groundwater, MTCA, groundwater
WEB PAGE Ione Kwik Stop groundwater monitoring
WATERSHED Water Resource Inventory Area 62 Pend Oreille
DATA Environmental Information Management (EIM) #FS32584416

RELATED PUBLICATIONS Title:

Addendum to Quality Assurance Project Plan: Ione Airport Kwik Stop Groundwater Monitoring