Publications Home


Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Addendum to Quality Assurance Project Plan Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Study Design

 
Publication number Date Published
13-03-117July 2013
VIEW NOW: Addendum to Quality Assurance Project Plan Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Study Design (Number of pages: 5) (Publication Size: 164KB)




Trouble viewing? Try these free options.
Author(s) Tarbutton, S.
Description This is an addendum to the project plan for the study, Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Study Design (Quality Assurance Project Plan) describing a time-of-travel dye study to supplement the data collection laid out in the original plan.
REQUEST A COPY The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

Accessibility Options
Persons with hearing loss can call 711 for Washington Relay Service
Persons with a speech disability can call 877-833-6341
Contact Scott Tarbutton at 509-329-3453 or scta461@ecy.wa.gov
Keywords Little Spokane River, TMDL, pH, dissolved oxygen
WATERSHED Water Resource Inventory Area 55 Little Spokane
RELATED PUBLICATIONS Title:

Addendum 2 to Quality Assurance Project Plan: Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Design

Quality Assurance Project Plan: Little Spokane River Watershed Dissolved Oxygen and pH Total Maximum Daily Load Study: Water Quality Study Design