Publications Home


Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Quality Assurance Project Plan: Tracking Short-Term Movements of Suspended Sediments in the Lower Duwamish Waterway.

 
Publication number Date Published
09-03-124October 2009
VIEW NOW: Quality Assurance Project Plan: Tracking Short-Term Movements of Suspended Sediments in the Lower Duwamish Waterway. (Number of pages: 36) (Publication Size: 1MB)




Trouble viewing? Try these free options.
Author(s) Gries, T. and J. Sloan
Description This is the study plan for tracking short-term movements of suspended sediments in the Lower Duwamish Waterway.
REQUEST A COPY The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

Accessibility Options
Persons with hearing loss can call 711 for Washington Relay Service
Persons with a speech disability can call 877-833-6341
Contact Joan LeTourneau at 360-407-6764 or jlet461@ecy.wa.gov
Keywords Lower Duwamish Waterway, tracking, suspended sediment, model, Green River, waterway, river, water, quality assurance project plan, Ecology
WEB PAGE Lower Duwamish Waterway
WATERSHED Water Resource Inventory Area 09 Duwamish-Green
RELATED PUBLICATIONS Title:

POSTER: Sediment transport and contaminant loading to the Lower Duwamish Superfund Site from the Green River: Application of innovative sampling technologies to verify model predictions

Lower Duwamish Waterway: Tracing Short-Term Movements of Suspended Sediment, Summary Report

POSTER: Use of Fluorescent Tracer Particles in the Lower Duwamish Waterway