Publications Home


Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Upper White Watershed Sediment and Temperature Total Maximum Daily Load (Water Cleanup Plan) for Aquatic Habitat: Detailed Implementation Plan

 
Publication number Date Published Date Revised
05-10-038March 2005January 2006
VIEW NOW: Upper White Watershed Sediment and Temperature Total Maximum Daily Load (Water Cleanup Plan) for Aquatic Habitat: Detailed Implementation Plan (Number of pages: 94) (Publication Size: 833KB)




Trouble viewing? Try these free options.
Author(s) Gary Ketcheson and Kim McKee
Description This document is the detailed implementation plan (DIP) for the Upper White River. It includes specific actions to be taken, a monitoring plan, reasonable assurances, and how success will be measured.
REQUEST A COPY The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

Accessibility Options
Persons with hearing loss can call 711 for Washington Relay Service
Persons with a speech disability can call 877-833-6341
Contact Donovan Gray at 360-407-6407 or donovan.gray@ecy.wa.gov
Keywords White River, habitat, temperature, cleanup, river, water cleanup plan, implementation plan, sediment, watershed, Total Maximum Daily Load, aquatic
RELATED PUBLICATIONS Title:

Mt. Baker Snoqualmie National Forest Upper White Watershed Sediment and Temperature TMDL for Aquatic Habitat: Submittal Report