Publications Home


Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Quality Assurance Project Plan: Total Maximum Daily Load Effectiveness Monitoring Study: Lakes Erie and Campbell

 
Publication number Date Published
04-03-206September 2004
VIEW NOW: Quality Assurance Project Plan: Total Maximum Daily Load Effectiveness Monitoring Study: Lakes Erie and Campbell (Number of pages: 30) (Publication Size: 83KB)




Trouble viewing?
Author(s) Bell-McKinnon, M.
Description This is the Quality Assurance Project Plan for the Total Maximum Daily Load Effectiveness Monitoring Study: Lakes Erie and Campbell.
REQUEST A COPY The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

Accessibility Options
Persons with hearing loss can call 711 for Washington Relay Service
Persons with a speech disability can call 877-833-6341
Contact Joan LeTourneau at 360-407-6764 or jlet461@ecy.wa.gov
Keywords environmental, lakes, 303(d), section 303, study, water, quality assurance, quality assurance project plan, monitoring, quality, Total Maximum Daily Load, lake, Environmental Protection Agency
WEB PAGE Lake Water Quality Monitoring
WATERSHED Water Resource Inventory Area 03 Lower Skagit-Samish
DATA Environmental Information Management (EIM) #mbell003

RELATED PUBLICATIONS Title:

Lake Campbell and Lake Erie Total Phosphorus Total Maximum Daily Load - Water Quality Effectiveness Monitoring Report

Campbell Lake Total Phosphorus Total Maximum Daily Load

Erie Lake Total Phosphorus Total Maximum Daily Load