Publications Home


Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Quality Assurance Project Plan: Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study

 
Publication number Date Published
04-03-103February 2004
VIEW NOW: Quality Assurance Project Plan: Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study (Number of pages: 124) (Publication Size: 8MB)




Trouble viewing? Try these free options.
Author(s) Roberts, M., B. Zalewsky, T. Swanson, L. Sullivan, K. Sinclair, and M. LeMoine
Description This is the Quality Assurance Project Plan for the following study: Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Study
REQUEST A COPY The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

Accessibility Options
Persons with hearing loss can call 711 for Washington Relay Service
Persons with a speech disability can call 877-833-6341
Contact Joan LeTourneau at 360-407-6764 or jlet461@ecy.wa.gov
Keywords Deschutes, Thurston, county, environmental, temperature, 303(d), section 303, study, river, plan, water, quality assurance, quality assurance project plan, assessment, sediment, quality, Total Maximum Daily Load, tribe, dissolved oxygen, fecal coliform, bacteria
WATERSHED Water Resource Inventory Area 13 Deschutes
DATA Environmental Information Management (EIM) #MROB0001

RELATED PUBLICATIONS Title:

Deschutes River, Percival Creek, and Budd Inlet Tributaries Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment TMDL: Water Quality Improvement Report and Implementation Plan

Deschutes River, Capitol Lake, and Budd Inlet Total Maximum Daily Load Study: Supplemental Modeling Scenarios

Focus on: Understanding the scientific process used for the Budd Inlet, Capitol Lake, and Deschutes River water cleanup plan

POSTER: Anthropogenic Dissolved Oxygen Impacts in Budd Inlet: Comparing Influences from a Lake or Estuary

Deschutes River, Capitol Lake, and Budd Inlet Temperature, Fecal Coliform Bacteria, Dissolved Oxygen, pH, and Fine Sediment Total Maximum Daily Load Technical Report: Water Quality Study Findings

POSTER: Modeling Dissolved Oxygen in Budd Inlet and Capitol Lake

POSTER: Using Models to Compare and Prioritize Actions in Puget Sound: Who’s Modeling What and Why?