Publications Home


Publication Summary

Our Ecology website has changed, which can cause broken links.
To report these, please contact us with the publication and broken link.

Title

Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT and PCBs in Lake Chelan

 
Publication number Date Published
03-03-105July 2003
VIEW NOW: Quality Assurance Project Plan: Total Maximum Daily Load Study for DDT and PCBs in Lake Chelan (Number of pages: 67) (Publication Size: 3MB)




Trouble viewing? Try these free options.
Author(s) Coots, R. and B. Era-Miller
Description This is a Quality Assurance Project Plan for the TMDL Study of DDT and PCBs in Lake Chelan
REQUEST A COPY The mission of the Department of Ecology is to protect, preserve, and enhance Washington’s environment. To help us meet that goal, please consider the environment before you print or request a copy.

Accessibility Options
Persons with hearing loss can call 711 for Washington Relay Service
Persons with a speech disability can call 877-833-6341
Contact Joan LeTourneau at 360-407-6764 or jlet461@ecy.wa.gov
Keywords creek, fish, 303(d), section 303, study, basin, plan, water, quality assurance, quality assurance project plan, quality, Total Maximum Daily Load, PCBs, lake
WATERSHED Water Resource Inventory Area 47 Chelan
DATA Environmental Information Management (EIM) #RCOO0004

RELATED PUBLICATIONS Title:

Lake Chelan DDT and PCBs in Fish Total Maximum Daily Load Study