216-A-29 Ditch (CUG 11)
[TSD ID#: D-2-3] The 216-A-29 Ditch is an unlined, man-made surface impoundment that was uncovered, unlined, and followed a natural drainage channel. It conveyed liquid effluent from the Plutonium-Uranium Extraction (PUREX) Facility to the 216-B-3-1 Ditch until July 1964, then to the 216-B-3-2 Ditch until September 1971 and later to the 216-B-3-3 Ditch until the 216-A-29 Ditch was taken out of service in 1991. The covered ditch area has been revegetated with water and sewer lines built across the ditch in various places, and also a road to support waste transfer actives. The closure of the 216-A-29 Ditch will be coordinated with final Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedial actions in the 200 Area.
Enforceable Permit:
Issued in accordance with the applicable provisions of the Hazardous Waste Management Act, Chapter 70A.300 Revised Code of Washington (RCW), and the regulations promulgated there under in Chapter 173-303 Washington Administrative Code (WAC).
Permit Number: WA7890008967
Addenda:
- A: Part A Form
- B: Reserved
- C: Reserved
- D: Groundwater Monitoring
- D: Groundwater Monitoring
- E: Security - Waiver
- F: Preparedness and Prevention Plan - Waiver
- G: Reserved
- H: Closure Plan
- I: Reserved
- J: Contingency Plan
- K: Reserved