183-H Solar Evaporation Basins Post-Closure Unit 2 (PCU-2)
[TSD ID#: T-1-4]
The 183-H Solar Evaporation Basins (183-H) were four concrete basins used for waste treatment, initially part of the water treatment facilities for the 100-H reactor.
They were later used for storage of chemical wastes that underwent solar evaporation. After evaporation, the waste solids and sludges were isolated and removed.
The 183-H basins received waste from 1973 to 1985, with the last shipment of wastes being sent to the basins in November 1985, and the remaining wastes removed in September 1988.
Liners were used to contain wastes inside the basins in the interim, following confirmed leakage from basin 1.
Sprayed-on liners were used on basins 2-4, and 36-ml Hypalon liners were used in basins 2 & 3.
As part of closure, the waste, debris, and concrete structures were removed and the unit was filled with clean soil.
Enforceable Permit:
Issued in accordance with the applicable provisions of the Hazardous Waste Management Act, Chapter 70A.300 Revised Code of Washington (RCW), and the regulations promulgated there under in Chapter 173-303 Washington Administrative Code (WAC).
Permit Number: WA7890008967
Addenda:
- A: Part A Form
- B: Reserved
- C: Reserved
- D: Groundwater Monitoring Plan
- E: Reserved
- F: Reserved
- G: Reserved
- H: Reserved
- I: Reserved
- J: Reserved
- K: Post-Closure Plan