Appendix 2.8: LOW-ACTIVITY WASTE PRETREATMENT SYSTEM ENGINEERING CALCULATIONS
The documents listed in the following table are incorporated by reference into this permit and are subject to the requirements set forth in Part I: Standard Conditions, Part II: General Facility Conditions, and Part III: Operating Unit 1 Conditions.
Upon request, copies of the documents can be viewed at:
Department of Ecology
3100 Port of Benton Blvd.
Richland, WA 99354
Call (509) 372-7950 to schedule an appointment to view LAWPS Permit documents.
Last Modification to Appendix 2.8 September 27, 2022
- Drawing/Document Number
- Description
- RPP-CALC-62458, Rev. 2
- TSCR Anchoring Base for Storage Pad-Seismic Calculation
- RPP-CALC-62465, Rev. 3
- TSCR IXC-150 (POR655-WP-IX-400A/B/C) ASME Section VIII Division 1, 2017 Edition Code Calculation
- RPP-CALC-62472, Rev. 2
- TSCR Filter (POR655-WP-FLT-325A/B) Pressure Vessel Code, Nozzle Load, and Seismic Calculation
- RPP-CALC-62484, Rev. 2
- TSCR Delay Tank (POR655-WP-TK-550) Pressure Vessel Code, Nozzle Load, & Seismic Calculation
- RPP-CALC-62577, Rev. 0
- TSCR ASME B31.3 Analysis of TSCR Process Piping
- RPP-CALC-62495, Rev. 0
- Pressure Relief Device Calculation
- RPP-CALC-62496, Rev. 3
- TSCR Filter Sizing
- RPP-CALC-62497, Rev. 2
- TSCR IXC-150 Sizing
- RPP-CALC-62498, Rev. 2
- TSCR Delay Tank Sizing
- RPP-CALC-62499, Rev. 2
- TSCR Media Trap Sizing
- RPP-CALC-62500, Rev. 2
- Process Enclosure Secondary Containment Sizing Calculation
- RPP-CALC-62504, Rev. 2
- TSCR Sump Pump Sizing
- RPP-CALC-62574, Rev. 0
- Tank Side Cesium Removal Process System Flow Analysis
- RPP-CALC-62532, Rev. 0
- Tank Side Cesium Removal System AP Farm Hydraulic Transient Analysis
- RPP-CALC-62640, Rev. 0
- Tank Side Cesium Removal Process Pump Flow Analysis
- RPP-CALC-62528, Rev. 0
- B31.3 Evaluation of Tie-In Transfer Lines
- RPP-CALC-62607, Rev. 0
- AP-106 to WTP LAW Facility Flow Analysis
Last modification to Appendix 2.8 September 27, 2022