Final Research, Development, and Demonstration Permit for the
2,000-Gallon Test Bed Initiative Demonstration
This RD&D Permit authorizes the 2,000-Gallon TBI Demonstration in order to test the feasibility and efficacy of deploying an in-tank pretreatment system (ITPS) to separate and pre-treat approximately 2,000 gallons of low-activity tank waste.
The pretreated waste will then be shipped offsite for grouting and disposal at Resource Conservation and Recovery Act permitted disposal facilities located outside the state of Washington.
Expiration Date: July 18, 2025
TBI Permit Files as appended by: PCN-TBI-2025-01
Table of Contents
Permit Files
- Drawing/Document Number
- Description
- Change Control Log
- Permit Conditions
- RD&D Permit
- RPP-RPT-61636, Rev. 03
- Data Quality Objectives (DQO) for Grab Sampling and Analysis of Pre-treated 241-SY-101 Liquid Waste in Process Totes
- RPP-PLAN-65394, Rev. 01
- Sampling and Analysis Plan for Pre-Treated 241-SY-101 Liquid Waste in Process Totes
Appendix A
- Drawing/Document Number
- Description
- DA-361651-01, Rev. 0
- IQRPE Design Assessment Report for Test Bed Initiative
Appendix B
- Drawing/Document Number
- Description
- 2309-WRP-209-PCP-001, Rev. 0
- Process Control Plan for the Test Bed Initiative (TBI) System
Appendix C
- Drawing/Document Number
- Description
- Change Control Log
- Appendix C Change Control Log
- H-14-112131, Rev. 00
- TBI SY-101 Site Plan
- H-14-112132, Rev. 00
- TBI SY-101 P&ID
- H-14-112133, Rev. 00
- TBI SY-101 Process Flow Diagram
- CEES‐16‐604‐M‐005, Rev. 1
- DOE TBI SY-101 Riser Adapter Assembly
- 2309-WRP-209-B, Rev. B
- Riser Adapter Assembly Supplement
- CEES‐16‐604‐M‐006, Rev. 1
- DOE TBI SY-101 Pump Column Assembly
- 2309-WRP-209-C, Rev. D
- Pump Column Assembly Supplement
- 2309-WRP-209-MOD-H, Rev. B
- TBI Hose Assemblies Modified
- CEES-16-604-M-008, Rev. 2
- DOE TBI SY-101 Pipe Stands
- 2309-WRP-209-DVM, Rev. C
- Distribution Valve Manifold
- CEES‐16‐604‐M‐023, Rev. 1
- DOE TBI SY-101 Delay Tote Assembly
- 2309-WRP-209-MOD-T, Rev. C
- Delay Tote Assembly Supplement
- 2309-WRP-209-BFS, Rev. A
- Backflush Skid Assembly
- H-14-112141, Rev. 00
- TBI SY-101 IX Column Vessel
- CEES‐16‐604‐M‐028, Rev. 1
- DOE TBI SY-101 Filter Assembly
- CEES‐16‐604‐M‐039, Rev. 1
- DOE TBI SY-101 Process Tote Assembly
- H-14-112134, Rev. 00
- TBI SY-101 42 Inch Riser Adapter Assembly & Shield Plug
- CEES‐16‐604‐M‐065, Rev. 1
- DOE TBI SY-101 Pipe in Pipe
- 2309-WRP-209-PIP, Rev. B
- Pipe in Pipe Supplement
Contact
For more information about the TBI Please contact Naoko Schiffern - Permit Coordinator, (509) 372-7950