Back to report list

601-255-951:LIFEPORT INC

Site:All Washington Employment, Tax Year:2012

Business Information
Name of Business as Registered: LIFEPORT INC
UBI Number used with Department of Employment Security
(if this number differs from Revenue's Tax Registration Number)
701979000
Total number of employees statewide (as reported to
Employment Security) on December 31, 2012
195
Employment Security Reference Number(s)
701979000
Check this box if you are a tooling manufacturer.
Check this box if you have no sites in Washington
Check this box if you have no business sites and no employees in Washington State.
How many manufacturing sites do you have in Washington that were supported by tax incentives during this calendar year?
1
Selected Incentives:
Aerospace Manufacturer
Manufacturing Site Details
Site Name:
All Washington Employment
Contact Name:
Address line 1
1610 Heritage Street
Address line 2
City
Woodland
Zip
98674
State
WA
Email Address
Daytime phone
Fax
Activity begin date
1/1/2012
mm/dd/yyyy
Activity end date

mm/dd/yyyy
SECTION 1a - EMPLOYMENT INFORMATION
Percentage of activities reflected in this report supported by tax incentives: 17.0%
OCCUPATIONS/STANDARD OCCUPATION CODE 1
Total no. of employees in this occupation
2a
Minimum Wage - $10(%)
2b
$10.01 - $15(%)
2c
$15.01 - $20(%)
2d
$20.01 - $30(%)
2e
$30.01 & Over(%)
Management 13 0.0 0.0 0.0 0.0 100.0
Business, financial, and legal operations 17 0.0 0.0 0.0 29.0 71.0
Computer, mathematical, architecture, and engineering 43 0.0 0.0 16.0 33.0 51.0
Life, physical, and social science 0
Community and social services 0
Education, training, and library 0
Healthcare practitioners, technical, and support 0
Protective services, building, and grounds maintenance 0
Sales and service 8 38.0 0.0 0.0 13.0 50.0
Office and administrative support 18 0.0 6.0 72.0 22.0 0.0
Construction and extraction 0
Installation, maintenance, and repair 4 0.0 0.0 0.0 75.0 25.0
Production, non-construction trades, and craft 91 0.0 18.0 46.0 31.0 5.0
Transportation and material moving 1 0.0 100.0 0.0 0.0 0.0
Other (forest, fishery, agriculture, military, arts, entertainment, and media) 0


OCCUPATIONS/STANDARD OCCUPATION CODE 3a
Full-Time Employees(%)
3b
Part-Time Employees(%)
3c
Temporary Employees(%)
4
Medical Benefits % Eligible
5
Retirement Benefits % Eligible
Management 100.0 0.0 0.0 0.0 0.0
Business, financial, and legal operations 100.0 0.0 0.0 0.0 0.0
Computer, mathematical, architecture, and engineering 100.0 0.0 0.0 0.0 0.0
Life, physical, and social science
Community and social services
Education, training, and library
Healthcare practitioners, technical, and support
Protective services, building, and grounds maintenance
Sales and service 100.0 0.0 0.0 0.0 0.0
Office and administrative support 100.0 0.0 0.0 0.0 0.0
Construction and extraction
Installation, maintenance, and repair 100.0 0.0 0.0 0.0 0.0
Production, non-construction trades, and craft 100.0 0.0 0.0 0.0 0.0
Transportation and material moving 100.0 0.0 0.0 0.0 0.0
Other (forest, fishery, agriculture, military, arts, entertainment, and media)
SECTION 1b - TEMPORARY STAFFING

1. What is the total number of persons obtained through temporary staffing firms? 8

2. What are the top three occupational codes in which those workers were placed?

1. Production, non-construction trades, and craft (SOC 51-0000)

2. Computer, mathematical, architecture, and engineering (SOC 15-0000, SOC 17-0000)

3.

3. What is the average duration of temporary employees? 91 days - 1 year

SECTION 2a - MEDICAL PLANS No Medical Plans Offered:
SECTION 2b - DENTAL PLANS No Dental Plans Offered:
SECTION 3 - RETIREMENT BENEFITS No Retirement Plans Offered:
SECTION 4 - ADDITIONAL QUESTIONS FOR ALUMINUM SMELTERS AND ELECTROLYTIC PROCESSING

For an aluminum smelter, what is the quantity of aluminum smelted at the manufacturing site during the calendar year covered by the report?

metric tons (MT = 2204.62 lbs).

For a chlor-alkali electrolytic processing business or sodium chlorate electrolytic processing business, what is the quantity of product produced at the manufacturing site during the calendar year covered by the report?

tons (2000 lbs).

For an aluminum smelter, chlor-alkali electrolytic processing business, or sodium chlorate electrolytic processing business:
What was your actual total employment at the manufacturing site for:

Q1

Q2

Q3

Q4

What is the number of employment positions affected or to be affected by any employment reductions that have been publicly announced during the sixty-day period preceding the date this report is submitted?

Back to report list