Industrial Fire Precaution Levels Valid for August 31, 2015
View Larger Map If you have questions or need more information, contact your region office at Region Directory.

How to use this map More information can be found on the Industrial Fire Precaution Level System.

IFPL map with PLS grid overlay 

To view this map on your smart phone or tablet, download the ArcGIS App to your device: Android or iTunes (iOS) or Windows Phone


Industrial Fire Precaution Level
Shutdown ZoneDNR Industrial Fire Precaution LevelComments
6022Partial Hootowl. the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer within 5 minutes roundtrip of the operation. A one hour fire watch is required after the shutdown of operations. For additional information go to dnr.wa.gov
609E4General Shutdown. All operations are prohibited.
609W4General Shutdown. All operations are prohibited.
6314General Shutdown. All operations are prohibited.
6334General Shutdown. All operations are prohibited.
649 N1Closed Season and Fire Tool and Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer on site. The one hour fire watch is required.
649 S1Closed Season and Fire Tool and Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer on site. The one hour fire watch is required.
6501Closed Season and Fire Tool and Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer on site. The one hour fire watch is required.
651 N2Partial Hootowl. the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer within 5 minutes roundtrip of the operation. A one hour fire watch is required after the shutdown of operations. For additional information go to dnr.wa.gov
651 S2Partial Hootowl. the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer within 5 minutes roundtrip of the operation. A one hour fire watch is required after the shutdown of operations. For additional information go to dnr.wa.gov
652 NE1Closed Season and Fire Tool and Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer on site. The one hour fire watch is required.
652 NW1Closed Season and Fire Tool and Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer on site. The one hour fire watch is required.
652 SE2Partial Hootowl. the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer within 5 minutes roundtrip of the operation. A one hour fire watch is required after the shutdown of operations.
652 SW1Closed Season and Fire Tool and Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer on site. The one hour fire watch is required.
6531Closed Season - Fire precaution requirements are in effect. A fire watch/ security is required at this and all higher levels unless otherwise waived.
653 S1Closed Season and Fire Tool and Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer on site. The one hour fire watch is required.
6541Closed Season and Fire Tool and Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer on site. The one hour fire watch is required.
6552Partial Hootowl. the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer within 5 minutes roundtrip of the operation. A one hour fire watch is required after the shutdown of operations. For additional information go to dnr.wa.gov
6562Partial Hootowl, the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect in designated areas. A one hour fire watch is required after the shutdown of operations.
6571Closed Season and Fire Tool and Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer on site. The one hour fire watch is required.
6582Partial Hootowl, the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer within 5 minutes roundtrip of the operation. A one hour fire watch is required after the shutdown of operations. For additional information go to dnr.wa.gov
659 N2Partial Hootowl. the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer within 5 minutes roundtrip of the operation. A one hour fire watch is required after the shutdown of operations.
659 S2Partial Hootowl. the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer within 5 minutes roundtrip of the operation. A one hour fire watch is required after the shutdown of operations. For additional information go to dnr.wa.gov
6602Partial Hootowl. the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer within 5 minutes roundtrip of the operation. A one hour fire watch is required after the shutdown of operations. For additional information go to dnr.wa.gov
660 S2Partial Hootowl. the following may operate only between the hours of 8 pm and 1 pm local time: Power saws except at loading sites, Cable yarding, blasting, welding or cutting of metal. Pump Truck Requirements are in effect. During industrial operations, you must have a 300 gallon pump truck or trailer within 5 minutes roundtrip of the operation. A one hour fire watch is required after the shutdown of operations. For additional information go to dnr.wa.gov
6754General Shutdown. All operations are prohibited.
6784General shutdown. All operations are prohibited.
678 E4General shutdown. All operations are prohibited.
678 W4General shutdown. All operations are prohibited.
6804General Shutdown. All operations are prohibited.
6844General shutdown. All operations are prohibited.
6854General shutdown. All operations are prohibited.
6864General shutdown. All operations are prohibited.
6874General shutdown. All operations are prohibited.
6884General shutdown. All operations are prohibited.

If you have questions or need more information, contact your region office at Region Directory.
More information can be found on the Industrial Fire Precaution Level System.
This document was last updated 8/30/2015 4:54:48 PM.